Matsushita CF-W5LWEZZ1 2 User Manual Page 73

  • Download
  • Add to my manuals
  • Print
  • Page
    / 117
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 72
73
9.3.6. Assembly knowhow of the Body
9.3.6.1. Setting LCD
9.3.6.2. Line processing LCD Cable (bottom case side)
Screw
Screw
b
a
LCD unit
The hinge is drawn up and the screw is tightened.
The order of tightening screw (DXQT26+D5FNL) : a b
Connection order
Inverter cable
LCD cable
Conductive cloth
Processes that cable should
not run aground on the DC-
jack holder.
Safety Work
Safety Work
Safety Work
Safety Work
Safety Work
Safety Work
Safety Work
Sheet’s edge and edge
are matched and put.
(The inclination part is
pressurized. )
The work order
Cable is processed under the
point hanging part.
(Floatage prevention)
Cable is processed to
the DC-jack holder.
Cable is processed
to the ditch.
Processes so that sheet should
not run aground in the screw
hole land.
(The figure below is state
after wiring)
VGA connector
Sheet
Cable
Bottom case
Main board
Screw hole land
Sheet must not
roll the holder.
The space is secured.
It is not possible to
recycle when flaking off.
Put the conductive cloth
Standard
Page view 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 116 117

Comments to this Manuals

No comments